Slide transcript
THE STORYLINE IN THREE LINES
Indonesia has just changed the rules on its municipal organic waste. Perpres 109/2025 created a regulator-mandated market for non-thermal waste-to-biomethane. Indonesia has zero operating capacity to serve it. Malaysia has three. USD 40 million single-LP raise deploys the first three plants, delivering portfolio Project IRR of 25.7% and Equity IRR of 54.2% over a 25-year concession.
Regulator-created market
Perpres 109/2025 mandates non-thermal AD for wet organic waste
Zero-capacity first-mover
Indonesia 0 operating plants · Malaysia operates 3 (Penang reference)
3 SPVs · 1,065 tpd
USD 40M deploys PD Pasarjaya · Bandung · Lampung Selatan
25.7% / 54.2%
Portfolio Project IRR · Portfolio Equity IRR at base case
Portfolio IRRs at base case across the 3-SPV consolidated cashflow.