OPERATING EVIDENCE
WHY PENANG MATTERS
Operating in Penang, Malaysia for years on the same CLAD configuration specified for the three Indonesia plants.
Anchors every key operating assumption in the financial model:
• Operating utilization target: >= 90%
• Biogas yield per tonne (MSW 80-120 m3/t · animal 300-500 m3/t)
• Parasitic load: 5-10% of biogas production
• Raw biogas methane content: 55-65%
• Upgraded CBG methane: >= 97%
• OPEX scaling baseline for staffing, chemicals, consumables
Technical-partner continuity: Greenviro Solutions Sdn Bhd is the consultant on both Penang and the Indonesia portfolio. Orec Sdn Bhd carries the AD-specific scope into the Bandung FS.
Same technology
CLAD configuration carried directly into all 3 SPVs
Same consultant
Greenviro Solutions on Penang and on Indonesia portfolio
Same feedstock
Co-digestion model (municipal + animal) operating practice
Same upgrading
Membrane / PSA to >=97% methane at pipeline spec